Our portfolio

Our priorities

Complete the Starter Project

Deliver the Project safely, on time, on budget and to the right quality.

Strengthening execution

by efficiently and effectively ramping up to sustainable operation;

  1. The Zone 5 operations based on Mechanized Mining execution principles &
  2. The Boseto processing facilities to design criteria.

Completing infrastructure execution

Complete construction and commissioning of the Boseto operations and site infrastructure.

Enable the Strategy

Through the right culture, capabilities, systems and continuous improvement to create value and deliver growth.

Starter project

The Starter Project, which is currently under construction, will produce more than 155,000t of copper concentrate at 38-42% copper content, containing some 60kt of copper and +2m ounces of silver annually. First concentrate is planned to be produced in mid‑year 2021.

Read more

Expansion project

The Expansion Project is expected to produce in excess of +125,000 tonnes of copper and +4.5Moz of silver per annum (average run rate at full production). Khoemacau has advanced its’ study work for increasing the ore production at Zone 5 from the currently designed 3.65Mtpa to 4.5Mtpa, including completing a study of various processing facility options.

Read more

Exploration project

Copper and silver mineralisation are hosted within the Ghanzi‑Chobe Fold and Thrust Belt that forms the southern portion of a much larger Pan African Mobile Belt, stretching from Namibia through Botswana, Zambia and into the Democratic Republic of Congo.

Read more

Reserves and resources

All Mineral Resource estimates were completed using MineSight software in UTM coordinates. A resource classification procedure defined by the number of drill holes and average distances to composites was used to classify blocks as Measured, Indicated or Inferred.

Read more